产品详情
肇庆基础工程超前钻

Is mainly aimed at the karst area pile foundation, before the pile by drilling method to check the bottom of pile foundation, is basically a pile hole and pile porous.

General in the pile design out, dug pile in place, pouring concrete before. General formation can be selected for investigation, each pile in karst area the best survey.

深圳深水井钻探在线咨询 肇庆基础工程超前钻探在线咨询