产品详情
广州基础工程超前钻

广州基础工程超前钻

Is mainly aimed at the karst area pile foundation, before the pile by drilling method to check the bottom of pile foundation, is basically a pile hole and pile porous. General in the pile design out, dug pile in place, pouring concrete before. General formation can be selected for investigation, each pile in karst area the best survey.